Conformance testing

Results: 357



#Item
11The Testcenter facility ‘LoRa® Test Lab’ within IMST GmbH is recognized by the LoRa™ Alliance for testing in accordance to the LoRaWAN™ Specification V1.0.1. Report for Test of Conformance to LoRaWAN™ V1.0.1 f

The Testcenter facility ‘LoRa® Test Lab’ within IMST GmbH is recognized by the LoRa™ Alliance for testing in accordance to the LoRaWAN™ Specification V1.0.1. Report for Test of Conformance to LoRaWAN™ V1.0.1 f

Add to Reading List

Source URL: lora-alliance.org

Language: English - Date: 2018-04-04 18:21:54
    12Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 3-phase data concentrator. Testing was conducted on phase 1.

    Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 3-phase data concentrator. Testing was conducted on phase 1.

    Add to Reading List

    Source URL: www.g3-plc.com

    - Date: 2018-03-18 03:48:50
      13Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A data concentrator communicating on 3 phases. Testing was performed on phase 1. Op

      Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A data concentrator communicating on 3 phases. Testing was performed on phase 1. Op

      Add to Reading List

      Source URL: www.g3-plc.com

      - Date: 2017-10-01 12:34:06
        14The Testcenter facility ‘LoRa® Test Lab’ within IMST GmbH is recognized by the LoRa™ Alliance for testing in accordance to the LoRaWAN™ Specification V1.0 Report for Test of Conformance to LoRaWAN™ V1.0 for th

        The Testcenter facility ‘LoRa® Test Lab’ within IMST GmbH is recognized by the LoRa™ Alliance for testing in accordance to the LoRaWAN™ Specification V1.0 Report for Test of Conformance to LoRaWAN™ V1.0 for th

        Add to Reading List

        Source URL: lora-alliance.org

        Language: English - Date: 2018-04-16 06:52:37
          15Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator communicating on 3 phases. Testing was performed on pha

          Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator communicating on 3 phases. Testing was performed on pha

          Add to Reading List

          Source URL: www.g3-plc.com

          - Date: 2017-11-28 07:42:47
            16Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 1-phase meter. Operating voltage applied for certification testing was 230V/50Hz. The ce

            Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 1-phase meter. Operating voltage applied for certification testing was 230V/50Hz. The ce

            Add to Reading List

            Source URL: www.g3-plc.com

            - Date: 2018-01-25 01:02:11
              17Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 3-phase meter communicating on 1 phase. Testing was performed on phase 1.

              Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 3-phase meter communicating on 1 phase. Testing was performed on phase 1.

              Add to Reading List

              Source URL: www.g3-plc.com

              - Date: 2018-03-18 03:09:31
                18Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 1-phase meter. Operating voltage applied for certification testing was 230V/50Hz.

                Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC FCC 1-phase meter. Operating voltage applied for certification testing was 230V/50Hz.

                Add to Reading List

                Source URL: www.g3-plc.com

                - Date: 2017-10-06 04:47:49
                  19Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator. Testing was performed on phase 1. Testing was performe

                  Annex 2: Protocol Implementation Conformance Statement (PICS) PICS related to performanceThe device tested is a G3-PLC CENELEC A 3-phase data concentrator. Testing was performed on phase 1. Testing was performe

                  Add to Reading List

                  Source URL: www.g3-plc.com

                  - Date: 2017-06-14 01:59:51
                    20

                    Green Button Data Conformance Testing Specification

                    Add to Reading List

                    Source URL: osgug.ucaiug.org

                    - Date: 2015-08-22 13:25:24